November 30, 2024
Alberta, Canada
Alberta Solar 1
Total Capacity
27 MWdc solar
Location
Alberta, Canada
Mounting Structure
single-axis tracking
Total 1st year
production
43,952 MWh
Total 40 year
production
1,620,950 MWh
ESTIMATED
PRODUCTION YIELD
1,640 kWh/kWdc
avoided
CO2 Emissions
1,148,739 tCO2e
TRANSMISSION
REGULATORY BODY
AESO
Project description
The project has a projected capacity of 27 MWdc solar
Located in southeastern Alberta, adjacent to Proteus Alberta Solar 2 and 3
The project has a land option on 139 acres with a local public institution
The 27 MWdc generation facility would require 3.3 mi of distribution lines to a 35kV line
Project development schedule estimated to be 16 months and will begin construction Q2 2024. The projected COD date is Q4 2024
The project is in the interconnection process with Fortis Alberta and has completed most of the interconnection studies
We are evaluating the potential of adding a battery storage system collocated with this facility