November 30, 2024
Alberta, Canada
Alberta Solar 3
Total Capacity
25 MWdc solar
Location
Alberta, Canada
Mounting Structure
single-axis tracking
Total 1st year
production
39,600 MWh
Total 40 year
production
1,460,448 MWh
ESTIMATED
PRODUCTION YIELD
1,650 kWh/kWdc
avoided
CO2 Emissions
1,034,994 tCO2e
TRANSMISSION
REGULATORY BODY
AESO
Project Description
The project has a projected capacity of 25 MWdc solar
Located in southeastern Alberta, adjacent to Proteus Alberta Solar 1 and 2
The project has a land option on 140 acres of lands with a local public institution
The 25 MWdc generation facility would require 3.1 mi of distribution lines and will connect to the distribution network at 35kV
Project development schedule estimated to be 16 months and will begin construction Q2 2024. The projected COD date is Q4 2024
The project is in the interconnection process with Fortis Alberta and has completed most of the interconnection studies