Alberta Solar 3
November 30, 2024
Alberta, Canada

Alberta Solar 3

Total Capacity

25 MWdc solar

Location

Alberta, Canada

Mounting Structure

single-axis tracking

Total 1st year
production

39,600 MWh

Total 40 year
production

1,460,448 MWh

ESTIMATED
PRODUCTION YIELD

1,650 kWh/kWdc

avoided
CO2 Emissions

1,034,994 tCO2e

TRANSMISSION
REGULATORY BODY

AESO

Project Description

  • The project has a projected capacity of 25 MWdc solar
  • Located in southeastern Alberta, adjacent to Proteus Alberta Solar 1 and 2
  • The project has a land option on 140 acres of lands with a local public institution
  • The 25 MWdc generation facility would require 3.1 mi of distribution lines and will connect to the distribution network at 35kV
  • Project development schedule estimated to be 16 months and will begin construction Q2 2024. The projected COD date is Q4 2024
  • The project is in the interconnection process with Fortis Alberta and has completed most of the interconnection studies