August 31, 2026
Texas, USA
Oak Forest Solar
Total Capacity
135 MWdc solar + 55 MW (4hr) battery storage
Location
Texas, USA
Mounting Structure
single-axis tracking
Total 1st year
production
256,635 MWh
Total 40 year
production
9,564,786 MWh
ESTIMATED
PRODUCTION YIELD
1,901 kWh/kWdc
avoided
CO2 Emissions
6,778,396 tCO2e
TRANSMISSION
REGULATORY BODY
ERCOT
Project Description
The project has a projected capacity of 135 MWdc solar + 55 MW (4hr) battery storage
The project has a land option on 640 acres of land with a single, private landowner
The 135 MWdc facility will use a 3.6 mi distribution line to connect to the ERCOT substation at 69kV
Project development schedule estimated to be 16 months and will begin construction Q3 2025. The projected COD date is Q3 2026
Project filed for interconnection in April 2023
Back to all projects