Oak Forest Solar

Total Capacity

135 MWdc solar + 55 MW (4hr) battery storage

Location

Texas, USA

Mounting Structure

single-axis tracking

Total 1st year
production

256,635 MWh

Total 40 year
production

9,564,786 MWh

ESTIMATED
PRODUCTION YIELD

1,901 kWh/kWdc

avoided
CO2 Emissions

6,778,396 tCO2e

TRANSMISSION
REGULATORY BODY

ERCOT

Project Description

  • The project has a projected capacity of 135 MWdc solar + 55 MW (4hr) battery storage
  • The project has a land option on 640 acres of land with a single, private landowner
  • The 135 MWdc facility will use a 3.6 mi distribution line to connect to the ERCOT substation at 69kV
  • Project development schedule estimated to be 16 months and will begin construction Q3 2025. The projected COD date is Q3 2026
  • Project filed for interconnection in April 2023