January 31, 2026
Texas, USA
Oyster Creek Solar 1
Total Capacity
200 MWdc solar + 80 MW (4hr) battery storage
Location
Texas, USA
Mounting Structure
single-axis tracking
Total 1st year
production
380,000 MWh
Total 40 year
production
14,162,600 MWh
ESTIMATED
PRODUCTION YIELD
1,900 kWh/kWdc
avoided
CO2 Emissions
10,036,786 tCO2e
TRANSMISSION
REGULATORY BODY
ERCOT
Project Description
The project has a projected capacity of 200 MWdc + 80 MW (4hr) battery storage
Located adjacent to Oyster Creek Solar 2
The project has a land option on 1,400 acres of private land where we will use up to 1,000 acres
The generation facility will connect to the transmission network at 138kV onsite
Project development schedule estimated to be 24 months and will begin construction Q1 2025. The projected COD date is Q1 2026