Pyote Solar
November 30, 2026
Texas, USA

Pyote Solar

Total Capacity

168 MWdc solar + 75 MW (2hr) battery storage

Location

Texas, USA

Mounting Structure

single-axis tracking

Total 1st year
production

374,249 MWh

Total 40 year
production

13,948,264 MWh

ESTIMATED
PRODUCTION YIELD

2,229 kWh/kWdc

avoided
CO2 Emissions

9,884,890 tCO2e

TRANSMISSION
REGULATORY BODY

ERCOT

Project Description

  • The project has a projected capacity of 168 MWdc solar + 75 MW (2hr) battery storage
  • The project has a land option with a private land owner on 672 acres of land
  • The 168 MWdc generation facility will tie-in to a 138kV transmission line
  • Project development schedule estimated to be 18 months and will begin construction Q4 2025. The projected COD date is Q4 2026
  • Project will file for interconnection in August 2023