November 30, 2026
Texas, USA
Pyote Solar
Total Capacity
168 MWdc solar + 75 MW (2hr) battery storage
Location
Texas, USA
Mounting Structure
single-axis tracking
Total 1st year
production
374,249 MWh
Total 40 year
production
13,948,264 MWh
ESTIMATED
PRODUCTION YIELD
2,229 kWh/kWdc
avoided
CO2 Emissions
9,884,890 tCO2e
TRANSMISSION
REGULATORY BODY
ERCOT
Project Description
The project has a projected capacity of 168 MWdc solar + 75 MW (2hr) battery storage
The project has a land option with a private land owner on 672 acres of land
The 168 MWdc generation facility will tie-in to a 138kV transmission line
Project development schedule estimated to be 18 months and will begin construction Q4 2025. The projected COD date is Q4 2026
Project will file for interconnection in August 2023
Back to all projects