May 31, 2026
Arizona, USA
Red Hawk Solar 1
Total Capacity
72 MWdc solar
Location
Arizona, USA
Mounting Structure
single-axis tracking
Total 1st year
production
164,448 MWh
Total 40 year
production
6,064,842 MWh
ESTIMATED
PRODUCTION YIELD
2,284 kWh/kWdc
avoided
CO2 Emissions
4,298,047 tCO2e
TRANSMISSION
REGULATORY BODY
WECC
Project Description
The project has a projected capacity of 72 MWdc solar
The project has a land option on 300 acres of lands with private mining entity
The 72 MWdc generation facility would require 1 mi of distribution lines and will connect to the transmission network at 115kV
Project development schedule estimated to be 24 months and will begin construction Q3 2025. The projected COD date is Q2 2026