Vernon Solar
September 30, 2025
Texas, USA

Vernon Solar

Total Capacity

93 MWdc solar + 38 MW (2hr) battery storage

Location

Texas, USA

Mounting Structure

single-axis tracking

Total 1st year
production

186,077 MWh

Total 40 year
production

6,935,082 MWh

ESTIMATED
PRODUCTION YIELD

1,988 kWh/kWdc

avoided
CO2 Emissions

4,914,771 tCO2e

TRANSMISSION
REGULATORY BODY

ERCOT

Project Description

  • The project has a projected capacity of 93 MWdc solar + 38 MW (2hr) battery storage
  • The project has a land option with a private land owner on 600 acres of land
  • The 93 MWdc generation facility will connect to the ERCOT distribution system at 69kV
  • Project development schedule estimated to be 18 months and will begin construction Q1 2025. The projected COD date is Q3 2025
  • Project has filed for interconnection in March 2023