September 30, 2025
Texas, USA
Vernon Solar
Total Capacity
93 MWdc solar + 38 MW (2hr) battery storage
Location
Texas, USA
Mounting Structure
single-axis tracking
Total 1st year
production
186,077 MWh
Total 40 year
production
6,935,082 MWh
ESTIMATED
PRODUCTION YIELD
1,988 kWh/kWdc
avoided
CO2 Emissions
4,914,771 tCO2e
TRANSMISSION
REGULATORY BODY
ERCOT
Project Description
The project has a projected capacity of 93 MWdc solar + 38 MW (2hr) battery storage
The project has a land option with a private land owner on 600 acres of land
The 93 MWdc generation facility will connect to the ERCOT distribution system at 69kV
Project development schedule estimated to be 18 months and will begin construction Q1 2025. The projected COD date is Q3 2025
Project has filed for interconnection in March 2023
Back to all projects